Hire a Drone

Construction Site Monitoring & Orthomosaic Mapping

Repeatable drone flights that give project teams orthomosaic maps, progress photos and stockpile volumes on a weekly or monthly schedule.

How it works

What a construction drone survey involves

Construction drone surveys capture the whole site from the same flight path on every visit. The images are stitched into a measured orthomosaic map and a 3D model, so project teams can compare progress week by week, measure stockpiles and earthworks, and share a clear record with clients and investors.

Common uses

  • →Weekly or monthly progress reporting to stakeholders
  • →Earthworks and stockpile volume tracking
  • →Contractor valuation and dispute evidence
  • →Site logistics and health and safety planning
Site viewIllustration

Handover pack

  • ✓Georeferenced orthomosaic map of the full site
  • ✓Progress photo and video set from fixed viewpoints
  • ✓Stockpile volume and cut/fill measurements
  • ✓Outputs ready for CAD, BIM and GIS tools

Rate card

Construction Monitoring prices by country

What moves the price

By city

Construction Monitoring near you

🇬🇧 United Kingdom

🇨🇦 Canada

🇦🇺 Australia

🇮🇪 Ireland

🇦🇪 United Arab Emirates

🇿🇦 South Africa

🇩🇪 Germany

🇳🇬 Nigeria

FAQ

Construction Monitoring questions

What is a construction drone survey?

Construction drone surveys capture the whole site from the same flight path on every visit. The images are stitched into a measured orthomosaic map and a 3D model, so project teams can compare progress week by week, measure stockpiles and earthworks, and share a clear record with clients and investors.

What do I receive after a construction monitoring?

Standard deliverables are: Georeferenced orthomosaic map of the full site; Progress photo and video set from fixed viewpoints; Stockpile volume and cut/fill measurements; Outputs ready for CAD, BIM and GIS tools. Maps and media within 48 hours of each visit.

How accurate is a drone construction survey?

With ground control points or an RTK drone, maps are typically accurate to a few centimetres. Without them, the map is still useful for progress and visuals, but measurements are less precise.

How often should a construction site be flown?

Weekly or fortnightly during earthworks and structure, and monthly for longer fit-out phases. Regular flights from the same path make progress and volume changes easy to compare.

Other drone services